Reporter
Golf link
Graffiti report and photo received 23-06-2011.
Kerry Smith confirmed that the toilet block is a DCC asset.
Please remove graffiti as required.
completed 24/6/11 1hr
Completed photo of toilet block wall. 23-06-2011
Graffiti removed on 23-06-2011 with a removal cost of $69.50.
One hour of graffiti removal by one staff member.
4 Commentaires
Reconnu darwingraffiti
Graffiti report and photo received 23-06-2011.
Kerry Smith confirmed that the toilet block is a DCC asset.
Please remove graffiti as required.
Graffiti crew
completed 24/6/11 1hr
darwingraffiti
Completed photo of toilet block wall. 23-06-2011
Clos darwingraffiti
Graffiti removed on 23-06-2011 with a removal cost of $69.50.
One hour of graffiti removal by one staff member.