Description
bike racks installed blocking the sidewalk on Thomas L Berkley
a aussi demandé...
Q. How long has the construction material been there?
A. picture was taken Fri 10/22
A. picture was taken Fri 10/22
Q. How much of the sidewalk is obstructed?
A. Pretty much all of it
A. Pretty much all of it
Q. Is the material covered?
A. No
A. No
Q. Is the material located near a storm drain inlet?
A. No
A. No
Q. Can you identify the company doing the construction work?
A. No
A. No
2 Commentaires
Reconnu City of Oakland (Membre officiel vérifié)
Clos City of Oakland (Membre officiel vérifié)