Mô tả
This entire cul-de-sac needs to be repaved ASAP. Covered in potholes
cũng đã hỏi...
Hỏi. Location Description (Please provide a specific street address OR street and cross-street)
Đáp. This entire cul-de-sac needs to be repaved ASAP. Covered in potholes
Đáp. This entire cul-de-sac needs to be repaved ASAP. Covered in potholes
Hỏi. Direction of Travel
Đáp. E
Đáp. E
Hỏi. Lane (curb, inside, fast, ...)
Đáp. all
Đáp. all
Hỏi. # of Potholes (Approx.)
Đáp. 11 or more
Đáp. 11 or more
3 Bình luậns
Được thừa nhận City of Tucson (Chính thức đã xác nhận)
City of Tucson (Chính thức đã xác nhận)
Many neighborhoods in the initial project list are now beginning construction with additional neighborhoods scheduled to begin later this winter and spring; however, Hampton Pl (or project in Phase 1) have not been scheduled at this time. Tucson Department of Transportation & Mobility (DTM) staff are working on the schedule of improvements while ensuring our work does not conflict with scheduled utility work.
DTM will notify residents before roadway improvement are scheduled to begin in their neighborhood. The overall 10-year schedule will be divided into three phases of neighborhood projects.
Additional information on the Tucson Delivers: Better Streets | Safe Streets Program can be found online at:
https://tucsondelivers.tucsonaz.gov/pages/better-streets-safe-streets.
Đã đóng City of Tucson (Chính thức đã xác nhận)